A draw bar should arrive from Kurt around 4/21.  It will need to be machined to length and drilled for a pin.
 
A draw bar should arrive from Kurt around 4/21.  It will need to be machined to length and drilled for a pin.
   −
The Kurt power draw bar has to be installed.  
+
Install the Kurt power draw bar.  
    
X, Y and Z limit switches need to be adjusted.
 
X, Y and Z limit switches need to be adjusted.
   −
Tension on the drive belts should be checked. Especially for the Y axis.
+
Check the tension on the drive belts. Especially for the Y axis.
    
Y axis ball screw cover is bent and not sliding properly. It should be removed and replaced (or bent straight). Removal is difficult because it is bent. This could require removing the table, which is heavy.
 
Y axis ball screw cover is bent and not sliding properly. It should be removed and replaced (or bent straight). Removal is difficult because it is bent. This could require removing the table, which is heavy.
Line 68: Line 68:     
Move the automated lube system power back to the relay in the control cabinet.  It is currently powered through a separate 110 v cord.
 
Move the automated lube system power back to the relay in the control cabinet.  It is currently powered through a separate 110 v cord.
 +
 +
Move the Heidenhain power source back to the Bridgeport control.
    
'''Purchase'''
 
'''Purchase'''
Line 75: Line 77:  
NMTB 30 drill chuck
 
NMTB 30 drill chuck
   −
Vise.
+
Vise
    
'''Miscellaneous'''
 
'''Miscellaneous'''