Anonymous

Changes

From Pumping Station One
313 bytes added ,  15:20, 6 March 2017
no edit summary
Line 20: Line 20:     
* Install limit switches
 
* Install limit switches
 +
* Work out touch off wiring
 
* Re-wire control box safely
 
* Re-wire control box safely
 
* Build PC workstation
 
* Build PC workstation
Line 36: Line 37:  
* Tube attachment
 
* Tube attachment
 
* scribe attachment
 
* scribe attachment
 +
 +
 +
== Required parts ==
 +
 +
* Smoothstepper Ethernet
 +
 +
 +
== Automatic Z zeroing ==
 +
 +
=== Ohmic sensing ===
 +
 +
Pros:
 +
 +
* Simple wiring torch needs a few accessories to make it work correct
 +
* Pre-build modules avaliable relatively cheeply ($75 candcnc)
 +
 +
Cons:
 +
 +
* Un-reliable with the water table
483

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.