Difference between revisions of "Clausing Lathe maintenance"
Jump to navigation
Jump to search
Line 49: | Line 49: | ||
|Nov 9 2017 | |Nov 9 2017 | ||
|Tucker | |Tucker | ||
+ | |- | ||
+ | |x | ||
+ | |x | ||
+ | | | ||
+ | |Jan 11, 2011 | ||
+ | |Tucker/Zlatan | ||
|- | |- | ||
|} | |} |
Revision as of 01:33, 12 January 2018
The Clausing Lathe, has a very involved maintenance schedule. The lathe should be lubricated daily, or at least as often as it is used. Please refer to the File:4900-Clausing-Brochure.PDF for the correct lubrication instructions. While users are expected to perform basic cleanup and lubrication on a per-use basis, PS1 should, on a monthly basis perform the following maintenance operations:
- clean
- oil ways
- oil internal mechanism according to manual's lubrication instructions
- adjust gibs
Clausing Lathe maintenance log table
Lubricate lathe per user manual | clean/oil ways | adjust gibs | date completed | person completing |
---|---|---|---|---|
monthly | monthly | monthly | ||
x | x | Aug3 2017 | Tucker/Miriam | |
x | x | sept 7 2017 | Tucker/Miriam | |
x | x | x | Oct 5 2017 | Tucker |
x | x | Nov 9 2017 | Tucker | |
x | x | Jan 11, 2011 | Tucker/Zlatan |