Anonymous

Changes

From Pumping Station One
no edit summary
Line 1: Line 1: −
The [[Clausing_Lathe|Clausing Lathe]], has a very involved maintenance schedule. The lathe should be lubricated daily, or at least as often as it is used.  Please refer to the [[File:4900-Clausing-Brochure.PDF|user manual]] for the correct lubrication instructions. While users are expected to perform basic cleanup and lubrication on a per-use basis, PS1 should, on a monthly basis perform the following maintenance operations:
+
The [[Clausing_Lathe|Clausing Lathe]], has a very involved maintenance schedule. The lathe should be lubricated daily, or at least as often as it is used.  Please refer to the [[File:Clausing10inLathe4900SeriesOperatingInstructions.pdf|user manual]] for the correct lubrication instructions. While users are expected to perform basic cleanup and lubrication on a per-use basis, PS1 should, on a monthly basis perform the following maintenance operations:
 
*clean
 
*clean
 
*oil ways
 
*oil ways
Line 6: Line 6:       −
== Example maintenance log table ==
+
== Clausing Lathe maintenance log table ==
 
{| class="wikitable" border="1"
 
{| class="wikitable" border="1"
 
! Lubricate lathe per user manual
 
! Lubricate lathe per user manual
Line 25: Line 25:  
|
 
|
 
|
 
|
 +
|-
 +
|x
 +
|x
 +
|
 +
|Aug3 2017
 +
|Tucker/Miriam
 +
|-
 +
|x
 +
|x
 +
|
 +
|sept 7 2017
 +
|Tucker/Miriam
 +
|-
 +
|x
 +
|x
 +
|x
 +
|Oct 5 2017
 +
|Tucker
 +
|-
 +
|x
 +
|x
 +
|
 +
|Nov 9 2017
 +
|Tucker
 +
|-
 +
|x
 +
|x
 +
|
 +
|Jan 11, 2018
 +
|Tucker/Zlatan
 +
|-
 +
|x
 +
|x
 +
|
 +
|Apr 5, 2018
 +
|Tucker/Daniel
 
|-
 
|-
 
|}
 
|}
Domain Admins
296

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.