==TODO==
 
==TODO==
   −
* Inlay tiles in the top, laser etched. Need beer church logo first.
  −
* Put sides on the bar.
  −
* Sand the edges, it's sorta sharp.
   
* Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
 
* Screw down the top of the bar; it is loose as is. Could unscrew later if we need to remove it.
* Finishing (maybe a very light stain - at least urethane). Bar topping epoxy?
+
* Install wood trim
 +
* Build enclosure for fridge
 +
* Move shelf in fridge up so there is more room to tap a Sankey keg underneath
 +
* Upgrade from 2 to 4 taps
 +
* Temperature sensors in fridge and tap line
 +
* Better gas distribution so manifold isn't hanging loose.
 +
* Beverage line locks and RFID controls