* <strike>All electrical circuits need to be traced, all boxes should be labeled. Follow our current convention and you can record info here:</strike> [[Electrical]] <br> ''This is done now''
 
* <strike>All electrical circuits need to be traced, all boxes should be labeled. Follow our current convention and you can record info here:</strike> [[Electrical]] <br> ''This is done now''
   −
=== Security ===
+
== Security ==
 
* We have two front doors and two back doors, and the loading dock. Our current security system is 4 channel. We need (5 to) 8 channels to cover all 5 locations. (Ryan Pierce sez)
 
* We have two front doors and two back doors, and the loading dock. Our current security system is 4 channel. We need (5 to) 8 channels to cover all 5 locations. (Ryan Pierce sez)
 
* Install security cameras above front and rear doors. Run wiring to furnace closet 2nd floor. Cameras and some wiring are said to exist.
 
* Install security cameras above front and rear doors. Run wiring to furnace closet 2nd floor. Cameras and some wiring are said to exist.