Line 102: Line 102:  
5. Relocated booth air drop to left side of booth.   
 
5. Relocated booth air drop to left side of booth.   
   −
6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CC/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec AM & BD tbd).
+
6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CM/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec GN, AM & BD tbd).
    
7. Transition member paid storage to share with MMT (done GN & Scott Yoder )
 
7. Transition member paid storage to share with MMT (done GN & Scott Yoder )
1,580

edits