Changes

Jump to navigation Jump to search
24 bytes added ,  21:10, 23 March 2019
no edit summary
Line 93: Line 93:  
<li>Remove the left and right side dies and set them aside</li>
 
<li>Remove the left and right side dies and set them aside</li>
 
<li>Use the 5/32” Allen wrench to loosen the set screws on the center die axle</li>
 
<li>Use the 5/32” Allen wrench to loosen the set screws on the center die axle</li>
<li>Remove the handle to release the center die. Be very careful when you remove the handle. The jack is being held up by the center die and will fall down when the handle is removed.</li>
+
<li>Remove the handle to release the center die. '''Be very careful when you remove the handle. The jack is being held up by the center die and will fall down when the handle is removed.'''</li>
 
<li>Set the center die set screws and the brass key stock aside.</li>
 
<li>Set the center die set screws and the brass key stock aside.</li>
 
<li>Use the 3/16” Allen wrench to remove the end cap from the left and right dies. Use the 5/32” Allen wrench to prevent the axle from turning, as shown below. Set the screws (2x) and washers (2x) aside.</li>
 
<li>Use the 3/16” Allen wrench to remove the end cap from the left and right dies. Use the 5/32” Allen wrench to prevent the axle from turning, as shown below. Set the screws (2x) and washers (2x) aside.</li>
<li>Use the 5/32” Allen wrench to loosen the set screw on the collars closest to the end caps that you removed. DO NOT loosen the other collar or you will break the alignment of the dies.</li>
+
<li>Use the 5/32” Allen wrench to loosen the set screw on the collars closest to the end caps that you removed. '''DO NOT loosen the other collar or you will break the alignment of the dies.'''</li>
 
<li>Remove the left and right dies from the axles and the bearings. Place dies on the marked post on the bottom of the tube roller stand.</li>
 
<li>Remove the left and right dies from the axles and the bearings. Place dies on the marked post on the bottom of the tube roller stand.</li>
 
<li>Place the center die on the marked post on the bottom of the tube roller stand.</li>
 
<li>Place the center die on the marked post on the bottom of the tube roller stand.</li>
Line 104: Line 104:  
<li>Insert the bearings into the centers of the left and right dies.</li>
 
<li>Insert the bearings into the centers of the left and right dies.</li>
 
<li>Place the left and right dies on the axles.</li>
 
<li>Place the left and right dies on the axles.</li>
<li>Place the collars over the axles and tighten them with the 5/32” Allen wrench. The set screws should be snug but not overtightened.</li>
+
<li>Place the collars over the axles and tighten them with the 5/32” Allen wrench. '''The set screws should be snug but not overtightened.'''</li>
<li>Reinstall the washer and cap screw using the 3/16” Allen wrench at the end of each axle. Use the 5/32” Allen wrench to prevent the axle from turning. The cap screw should be snug but not overtightened.</li>
+
<li>Reinstall the washer and cap screw using the 3/16” Allen wrench at the end of each axle. Use the 5/32” Allen wrench to prevent the axle from turning. '''The cap screw should be snug but not overtightened.'''</li>
 
<li>Insert the handle through the frame just far enough to hold the die rack at the right height, as shown below.</li>
 
<li>Insert the handle through the frame just far enough to hold the die rack at the right height, as shown below.</li>
 
<li>Insert the handle through the center die using the key stock to center the handle and center die.</li>
 
<li>Insert the handle through the center die using the key stock to center the handle and center die.</li>
22

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu