Line 1: |
Line 1: |
− | [[Category:Past Projects]]
| |
| == Concept == | | == Concept == |
| This is what I envision as our final kegerator set up: | | This is what I envision as our final kegerator set up: |
Line 8: |
Line 7: |
| | | |
| With the front mounted tap set up from the first link, using the | | With the front mounted tap set up from the first link, using the |
− | materials/construction instructions from the second. Once we gather | + | materials/construction instructions from the second. Once we gather |
| the materials we should be able to get it together in a couple days. | | the materials we should be able to get it together in a couple days. |
| That said, I would like to have it set up for at least one beer by the | | That said, I would like to have it set up for at least one beer by the |
− | time our P-P-Power Ale is ready to drink. This will save us the | + | time our P-P-Power Ale is ready to drink. This will save us the |
| pleasure of a bottling party, and enable us to drink it in a day or | | pleasure of a bottling party, and enable us to drink it in a day or |
| so, rather than waiting for a secondary fermentation. | | so, rather than waiting for a secondary fermentation. |
Line 20: |
Line 19: |
| ft.) | | ft.) |
| | | |
− | - 1 x 6's (also about 16 ft) | + | - 1 x 6's (also about 16 ft) |
| | | |
| - Polyurethane/stain of some sort | | - Polyurethane/stain of some sort |
Line 47: |
Line 46: |
| | | |
| - 16 x hose clamps | | - 16 x hose clamps |
| + | |
| + | [[Category:Past Projects]] |