Changes

Jump to navigation Jump to search
m
Robot: Cosmetic changes
Line 1: Line 1: −
This motion was proposed on April 16, 2013
+
This motion passed on April 23, 2013
   −
===Sponsor===
+
=== Sponsor ===
 
Eric Stein
 
Eric Stein
   −
===History===
+
=== History ===
 
April 16, 2013 - Proposed
 
April 16, 2013 - Proposed
   −
===Language===
+
April 23, 2013 - Passed
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment.  This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
     −
===Addendum===
+
=== Language ===
 +
Pumping Station: One will provide a budget of up to $970 to whomever purchases materials for and builds out kitchen walls for Pumping Station: One where the kitchen equipment is currently located, also enclosing the beer brewing equipment. This will not include electrical build out, which will be handled later once walls have been created to install electrical circuits in. The kitchen will be 13.5' x 32'.
 +
 
 +
=== Addendum ===
    
The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
 
The plans are located at http://des.truct.org/forums/ps1_KITCHEN%202D.pdf - the eventual goal.
   −
===Vote===
+
=== Vote ===
Yea:  
+
Yea: 39
Nay:  
+
Nay: 1
Present:  
+
Present: 2
 +
Total full members: 68. Quorum met. Motion passed.
   −
[[Category: Votes]][[Category: 2013_Votes]]
+
[[Category:Votes]]
 +
[[Category:2013 Votes]]
 +
[[Category:Finance]]
 +
[[Category:Budget]]
Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu