Anonymous

Changes

From Pumping Station One
204 bytes added ,  23:38, 27 March 2022
no edit summary
Line 14: Line 14:  
}}
 
}}
   −
Placeholder for new page.   
+
PS1s ladders have been reviewed by the General Operations Team in 2021.
 +
The primary location in the south shop (wood and hot metals) is in Woods to the right of the plywood rackIt comprised of a 4,8, and 12 ft A frame ladders.
 +
 
    
Two very tall folding step ladders one 12 footer  labeled “Bonaparte” is loaned. ( Eric Beauchamp) On wall between hot metals and woodshop. Smaller one is 10 ft.  (These should be returned to members.  
 
Two very tall folding step ladders one 12 footer  labeled “Bonaparte” is loaned. ( Eric Beauchamp) On wall between hot metals and woodshop. Smaller one is 10 ft.  (These should be returned to members.  
1,580

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.