Changes

Jump to navigation Jump to search
1,005 bytes added ,  01:43, 27 May 2018
Line 37: Line 37:     
== Specifications ==
 
== Specifications ==
 +
 +
Swing over bed 15 1/2 "
 +
Length of bed 54"
 +
Power required - 220 3 ph 30a ckt
 +
 +
NOTE: The manual specifies SAE 20 oil, it is the same as ISO 68 or Way oil
    
== Auth/Use Notes ==
 
== Auth/Use Notes ==
    
== To-Do ==
 
== To-Do ==
 +
 +
As of May 2018 ( Jim Brink)
 +
- Some cleaning of oil ports may be needed before topping off oil reservoirs, also should existing oil be drained?
 +
- Should we replace hydraulic filter? It's not in manual but it seems like something you may want to change?
 +
- Top off oil reservoirs, oil machine  and follow maintenance in manual.
 +
- Chuck needs to be removed and cleaned
 +
- Fit the tool post
 +
- We need a plank to put under the chuck on removal.
 +
- Do we need some device to help lift chucks on removal ( they weigh approx 100#)
 +
- Taper attachment needs to be cleaned and tested
 +
- Level and check for taper
 +
- Any tooling needed?
 +
- Do we want to fit a DRO? NOTE: the Cold metals budget is getting tight for this tool we may budget this in 2019
 +
- Do we want to fit cooling?
 +
- Need to find a chuck key for the Jacobs chuck
 +
- Authorization path
    
== Maintenance ==
 
== Maintenance ==
533

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu