Anonymous

Changes

From Pumping Station One
no edit summary
Line 17: Line 17:  
* Secondary electron detector (functional)
 
* Secondary electron detector (functional)
 
* 4 quadrant silicon backscatter detector (non-functional, troubleshooting in progress)
 
* 4 quadrant silicon backscatter detector (non-functional, troubleshooting in progress)
* Oxford Isis EDX detector (non-functional, requires liquid nitrogen to operate)
+
* Oxford Isis EDX detector (working, requires liquid nitrogen to operate)
 
* High Resolution Recording Unit (HRRU) (not currently connected, Polaroid film no longer produced)
 
* High Resolution Recording Unit (HRRU) (not currently connected, Polaroid film no longer produced)
   Line 92: Line 92:  
! Maintainer
 
! Maintainer
 
! Description
 
! Description
 +
!-
 +
|4/21/2013
 +
|Ryan Pierce
 +
|Did full detector calibration of EDX with copper target. Also changed SEM configuration to show multi-dot EDX present, which enabled EDX presence mapping, including support for multiple channels. (Tested 3.) Noted that Isis EDX PC floppy drive failed; need replacement.
 +
|-
 +
|4/20/2013
 +
|Ryan Pierce
 +
|Added liquid nitrogen to dewar and reset liquid nitrogen temperature sensor calibration. Demonstrated that EDX is functional.
 +
|-
 +
|7/14/2013
 +
|Ryan Pierce
 +
|Changed EDX power supply voltage from 240V to 120V. Computer now recognizes detector. Customer self-test passed.
 
|-
 
|-
 
|4/14/2013
 
|4/14/2013
97

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.