Anonymous

Changes

From Pumping Station One
246 bytes added ,  17:20, 9 December 2009
Line 2: Line 2:     
== Space Requirements ==
 
== Space Requirements ==
5000 ft2 - 10000 ft2 or 460 m2 to 930 m2
+
* 5000 ft2 - 10000 ft2 or 460 m2 to 930 m2
 +
* move in date on or after September 15th
 +
* We will probably need about 1 month to move into the new space and we need at least a Six month agreement from April 15th, the earliest we could get out is October 15
    
=== Desired Resources ===
 
=== Desired Resources ===
Line 21: Line 23:  
* access to water in the space
 
* access to water in the space
 
* ability to modify/improve the structure to test out green tech (thus lowering our heating bills) and to get a discount on rent for it.
 
* ability to modify/improve the structure to test out green tech (thus lowering our heating bills) and to get a discount on rent for it.
 +
* Garage Door
 +
* Secure Entrances
    
=== Prospective Neighborhoods ===
 
=== Prospective Neighborhoods ===
4

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.