Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
{{NeedsUpdate|Some of this information is from the old location of the dust collector, and some of the details are missing or incorrect.  There is a group working on dust collection needs, performance and recommendations. we started in October 2018 as interim information is available we will update this wikipage and wherever necessary
+
{{NeedsUpdate|Some of this information is from the old location of the dust collector, and some of the details are missing or incorrect.  There is a group working on dust collection needs, performance and recommendations.  
 +
 
 +
we started in October 2018as interim information is available we will update this wikipage and wherever necessary
    
https://wiki.pumpingstationone.org/2019_Woodshop_Dust_Collection_Vote
 
https://wiki.pumpingstationone.org/2019_Woodshop_Dust_Collection_Vote
      −
Soundproof Room for new system is almost completed. New unit should be purchased in early June. We are hyping for completion in July.   
+
Soundproof Room for new system is almost completed. New unit should be purchased in early June. We are hoping for completion in July.
https://www.grizzly.com/products/Grizzly-10-HP-3-Phase-Cyclone-Dust-Collector/G0638 }}
+
 
 +
New unit is is assembled and in place. The team has  replaced/rerouted the ductwork and is in the process of redoing electrical for four major stationary tools (drum sander, planer,jointer and bandsaw) EcoGate automatic blast gates are installed.
 +
We are projecting December completion.
 +
 
 +
—Gary
 +
   
 +
https://www.grizzly.com/products/Grizzly-10-HP-3-Phase-Cyclone-Dust-Collector/G0638
 +
 
 +
 
 +
 
 +
 
 +
 
 +
}}
      Line 28: Line 42:  
we started in October 2018
 
we started in October 2018
 
as interim information is available we will update this wikipage and wherever necessary
 
as interim information is available we will update this wikipage and wherever necessary
 +
 +
 +
August  2019--The core team (led by Zack Sasnow and a few others) are in the process of assembling the Grizzly DC. Need to lift the power head and put the cyclone and filters under it.  Then comes building the ductwork that we measured and designed.  And connecting the main tools.  Erik is designing our tool racks and benches around that.  We hope to be totally tidy in a month or two. 
 +
... 
 +
Being an old wreck, I assist in any way that I can without lifting toting or straining. --gary 
 +
  [[File:grizz002.jpg]]][[File:grizz001.jpg]]
 
  --
 
  --
  
1,580

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu