Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
{{NeedsUpdate|Some of this information is from the old location of the dust collector, and some of the details are missing or incorrect.  There is a group working on dust collection needs, performance and recommendations.  
 
{{NeedsUpdate|Some of this information is from the old location of the dust collector, and some of the details are missing or incorrect.  There is a group working on dust collection needs, performance and recommendations.  
   −
we started in October 2018 as interim information is available we will update this wikipage and wherever necessary
+
we started in October 2018as interim information is available we will update this wikipage and wherever necessary
    
https://wiki.pumpingstationone.org/2019_Woodshop_Dust_Collection_Vote
 
https://wiki.pumpingstationone.org/2019_Woodshop_Dust_Collection_Vote
Line 8: Line 8:  
Soundproof Room for new system is almost completed. New unit should be purchased in early June. We are hoping for completion in July.  
 
Soundproof Room for new system is almost completed. New unit should be purchased in early June. We are hoping for completion in July.  
    +
New unit is is assembled and in place. The team has  replaced/rerouted the ductwork and is in the process of redoing electrical for four major stationary tools (drum sander, planer,jointer and bandsaw) EcoGate automatic blast gates are installed. 
 +
We are projecting December completion.
 +
 +
—Gary
 
   
 
   
 
https://www.grizzly.com/products/Grizzly-10-HP-3-Phase-Cyclone-Dust-Collector/G0638
 
https://www.grizzly.com/products/Grizzly-10-HP-3-Phase-Cyclone-Dust-Collector/G0638
Line 26: Line 30:  
|serial = ?
 
|serial = ?
 
|arrived = 2014
 
|arrived = 2014
|doesitwork = yes
+
|doesitwork = no
 
|contact = Dean Anderson, Michael Skilton
 
|contact = Dean Anderson, Michael Skilton
|where = wood Shop
+
|where = removed
 
|value = $2000
 
|value = $2000
 
|image = Dust_collector.jpg
 
|image = Dust_collector.jpg
|hostarea = Wood Shop
+
|hostarea = retired from woodshop
 
}}
 
}}
   Line 38: Line 42:  
we started in October 2018
 
we started in October 2018
 
as interim information is available we will update this wikipage and wherever necessary
 
as interim information is available we will update this wikipage and wherever necessary
 +
 +
 +
August  2019--The core team (led by Zack Sasnow and a few others) are in the process of assembling the Grizzly DC. Need to lift the power head and put the cyclone and filters under it.  Then comes building the ductwork that we measured and designed.  And connecting the main tools.  Erik is designing our tool racks and benches around that.  We hope to be totally tidy in a month or two. 
 +
... 
 +
Being an old wreck, I assist in any way that I can without lifting toting or straining. --gary 
 +
  [[File:grizz002.jpg]]][[File:grizz001.jpg]]
 
  --
 
  --
   Line 124: Line 134:     
[[Category:Shop Equipment]]
 
[[Category:Shop Equipment]]
[[Category:Wood Shop]]
 
1,580

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu