Changes

Jump to navigation Jump to search
235 bytes added ,  00:16, 10 December 2010
no edit summary
Line 13: Line 13:  
*safety gear wall
 
*safety gear wall
 
**can we put it on the wall outside?
 
**can we put it on the wall outside?
 +
*If we keep the table saw, we need to see if Steve has the blade guard to put back on or we need to buy a new one.
    
==Infrastructure==
 
==Infrastructure==
Line 73: Line 74:  
*back wall should be painted flat black to cut down UV reflection
 
*back wall should be painted flat black to cut down UV reflection
 
*sheet metal shielding should go around the dry wall near the hot area
 
*sheet metal shielding should go around the dry wall near the hot area
 +
*Since it is so big, we need to decide if we are going to make use of Steve's table saw before the layout is finalized.
Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu