Changes

Jump to navigation Jump to search
1,105 bytes added ,  10:11, 10 April 2016
Line 21: Line 21:  
No changes to our current space that require a building permit.
 
No changes to our current space that require a building permit.
   −
Plan 1:
+
Plan notes
   −
Plan 2:
+
Plan 1: Woodworking and dusty CNC tools move to new space.  Dust and noise are isolated from other areas with a wall. Close proximity to the loading dock allows for easy delivery of sheet goods and lumber.  Hot metals moves to the front of the new space where through-the-roof ventilation is best. Cold metals and jewelry expand into the current woodshop.   
   −
Plan 3:  
+
Plan 2: Hot metals moves to the back of the new space.  Opening the two big doors will give hot metals good ventilation. There is a smaller, but adequate, vent through the roof for welding and forge ventilation. Woodworking moves to the front of the new space. Dust and noise are isolated from other areas with a wall. Materials can be delivered through the front door on the Elston side of the new space.  Cold metals and jewelry expand into the current woodshop.   
 +
 
 +
Plan 3: Woodworking expands into the cold metals area.  Cold and hot metals moves to the new side.  This plan minimizes disruption of the woodshop and rework of the woodworking dust collection system, but the doesn't contain the dust.  The kitchen, catwalk storage will still be dusty. 
     
Domain Admins
586

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu