Changes

Jump to navigation Jump to search
29 bytes added ,  21:44, 10 April 2016
Line 25: Line 25:  
Reasonable accommodations will be made to comply with the Americans with Disability Act (as advised by our attorney and architects).   
 
Reasonable accommodations will be made to comply with the Americans with Disability Act (as advised by our attorney and architects).   
   −
Status of plans -  
+
===Status of plans ===-  
    
Details of the plans are subject to change.  New walls may be shifted to avoid obstacles and square footage of rooms may be adjusted to receive more favorable permit status.  If significant changes are needed, the planning committee will consult with the membership before proceeding.
 
Details of the plans are subject to change.  New walls may be shifted to avoid obstacles and square footage of rooms may be adjusted to receive more favorable permit status.  If significant changes are needed, the planning committee will consult with the membership before proceeding.
   −
Plan notes  
+
===Plan notes===
    
Plan 1: Woodworking and dusty CNC tools move to new space.  Dust and noise are isolated from other areas with a wall. Close proximity to the loading dock allows for easy delivery of sheet goods and lumber.  Hot metals moves to the front of the new space where through-the-roof ventilation is best. Cold metals and jewelry expand into the current woodshop.     
 
Plan 1: Woodworking and dusty CNC tools move to new space.  Dust and noise are isolated from other areas with a wall. Close proximity to the loading dock allows for easy delivery of sheet goods and lumber.  Hot metals moves to the front of the new space where through-the-roof ventilation is best. Cold metals and jewelry expand into the current woodshop.     
Line 37: Line 37:  
Plan 3:  Woodworking expands into the cold metals area.  Cold and hot metals moves to the new side.  This plan minimizes disruption of the woodshop and rework of the woodworking dust collection system, but the doesn't contain the dust.  The kitchen, catwalk storage will still be dusty.   
 
Plan 3:  Woodworking expands into the cold metals area.  Cold and hot metals moves to the new side.  This plan minimizes disruption of the woodshop and rework of the woodworking dust collection system, but the doesn't contain the dust.  The kitchen, catwalk storage will still be dusty.   
   −
Funding -
+
===Funding===
   −
Schedule -
+
===Schedule===
 
The May 1 move in date seems unlikely given that the lease has not been signed (4/10/16).  
 
The May 1 move in date seems unlikely given that the lease has not been signed (4/10/16).  
   −
Build out. First do activities that will be impeded by having tools that are in the way.
+
===Build out===
 +
First do activities that will be impeded by having tools that are in the way.
 
highest priority: paint walls in new space; remove partitions in new lounge, paint; add ventilation to clean CNC room, move clean CNC equipment; upgrade lighting;  
 
highest priority: paint walls in new space; remove partitions in new lounge, paint; add ventilation to clean CNC room, move clean CNC equipment; upgrade lighting;  
 
medium priority:
 
medium priority:
 
lower priority:
 
lower priority:
   −
Voting -
+
===Voting===
    
Full members will determine the preferred space plan using instant-runoff voting. https://en.wikipedia.org/wiki/Instant-runoff_voting  
 
Full members will determine the preferred space plan using instant-runoff voting. https://en.wikipedia.org/wiki/Instant-runoff_voting  
Domain Admins
586

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu