The main reason only 1 ton was chosen is we have a very small number of tools that weight more than 2000# and some of those tools already have moving systems built in. It was decided that for the amount it would cost to go to a 2 ton gantry and the amount of usage it would get above half its capacity would not be viable in our current economic situation. | The main reason only 1 ton was chosen is we have a very small number of tools that weight more than 2000# and some of those tools already have moving systems built in. It was decided that for the amount it would cost to go to a 2 ton gantry and the amount of usage it would get above half its capacity would not be viable in our current economic situation. |