Line 3: |
Line 3: |
| ==Woodshop== | | ==Woodshop== |
| | | |
− | Drops at sawstop, and multiple at each table row.
| + | Reel drops at sawstop, and multiple at each table row. |
| Sawstop + dust manager need more power. | | Sawstop + dust manager need more power. |
| | | |
| ==Electronics== | | ==Electronics== |
| | | |
− | 1. We need 2 drops of three phase 50 Amp in the metal shop. Any where along the long wall. | + | 1. The ceiling extension cord in the electronics lab needs to be replaced with surface wiring. Three boxes spaced where the retractable drops are located. Do reel drops. |
| | | |
− | 2. The ceiling extension cord in the electronics lab needs to be replaced with surface wiring. Three boxes spaced where the retractable drops are located. | + | 2. Since we are doing electrical we also need addition outlets on the opposite side of the ceiling in front of the the projection wall and white boards. I would suggest additional 3 outlet boxes spaced the same as the surface wiring to replace the yellow extension cord. Same drops as the other part of the room. |
− | | |
− | 3. Since we are doing electrical we also need addition outlets on the opposite side of the ceiling in front of the the projection wall and white boards. I would suggest additional 3 outlet boxes spaced the same as the surface wiring to replace the yellow extension cord.
| |
| | | |
| ==Kitchen== | | ==Kitchen== |
| | | |
| GHCI outlet by sink. | | GHCI outlet by sink. |
− | TBD remainder on walls.
| |
| Fix bent electrical drop from ceiling. | | Fix bent electrical drop from ceiling. |
− | 3 phase for the beer brewing fermenter system.
| |
| | | |
| ==Lounge== | | ==Lounge== |
| | | |
| Fix exposed wiring, which there is now more of. | | Fix exposed wiring, which there is now more of. |
| + | Outlets as needed to solve the extension cords issue. |
| | | |
| ==Metal Shop== | | ==Metal Shop== |
| | | |
| The circuit that goes along the shop side of the shop (wood, metal) with the really long conduit, is one circuit. It trips sometimes if people are using everything. | | The circuit that goes along the shop side of the shop (wood, metal) with the really long conduit, is one circuit. It trips sometimes if people are using everything. |
| + | |
| + | Run a new circuit from the panel inside the shop, run power off of there. Shorten the wood shop circuit so it doesn't extend to metal. |
| | | |
| ==General Shop Area== | | ==General Shop Area== |
| | | |
− | Fix drops that are not on stiff supports or use the wrong kind of conduit. | + | Fix drops that are not on stiff supports or use the wrong kind of conduit. Where there are no drops, we should add some. |
| + | Everything should be metered to avoid having 220 where it's not supposed to be 220 and vice versa. |
| Fix breaker boxes to be properly screwed shut. | | Fix breaker boxes to be properly screwed shut. |
| Map breakers. | | Map breakers. |
− | Power for eventual hot metal and glass room?
| |