→‎What is the Bill of Materials?: the desctuctorg links was actually for the plans, not the bom
Line 31: Line 31:     
* Plumbing is not covered in this budget proposal.
 
* Plumbing is not covered in this budget proposal.
* The plumbing is one of the next stages and will be considerable more expensive
+
* The plumbing is one of the next stages and will be considerabley more expensive
 
* Some plumbing is exposed outside of the wall
 
* Some plumbing is exposed outside of the wall
    
== What about the ceiling? ==
 
== What about the ceiling? ==
   −
We've gone over the ceiling a bunch- there's no good way to do it. (d34fish)
+
* A ceiling is not part of this proposal.
 
+
* A ceiling of some type can be installed, it won't be drywall and will probably be either be a drop ceiling or an extension of the catwalk.
* We can't make the ceiling legal height and still meet code (d34fish)
  −
* The lath board we'd need to hang the ceiling off the cinderblock wall would require us to completely repipe all of the plumbing that runs at the top under the catwalk (d34fish)
  −
* A drop ceiling is certainly feasible, as is putting some kind of floor sheet on the catwalk. Both options can extend to meet the wall and will close out dust. --[[User:TuckerTomlinson|Tucker]]
      
== Budget breakdown ==
 
== Budget breakdown ==
Line 58: Line 55:  
== What is the Bill of Materials? ==
 
== What is the Bill of Materials? ==
   −
Exactly what is being purchased?
+
The Bill of materials can be found on [https://groups.google.com/group/pumping-station-one/attach/4e8dc95d9fd52020/ps1wallsnew.xlsx?part=4&authuser=0 google groups].
 +
Please note the BOM is a plan and not final.  The final BOM is not part of the vote.
    
== Are the current plans substancial enough to make the kitchen a functional learning kitchen? ==
 
== Are the current plans substancial enough to make the kitchen a functional learning kitchen? ==
Line 78: Line 76:     
I don't remember lights in the budget.
 
I don't remember lights in the budget.
 +
 +
* There are two track lights under the catwalk that will be in the kitchen area.  I still think it will be a bit dark in there.
    
== Ventilation ==  
 
== Ventilation ==  
    
Do the walls themselves (without a ceiling) cause a ventilation issue?
 
Do the walls themselves (without a ceiling) cause a ventilation issue?
 +
 +
* We are pretty sure they will not.  The walls will not completely enclose the space and will only be 8 or 10 feet high.  Before we put any type of ceiling on the kitchen, we will create an stove vent that will go through the building ceiling.
    
== Wall height ==
 
== Wall height ==
    
How high are the walls going to be?
 
How high are the walls going to be?
 +
 +
* Eric said 8 or 10 feet high.  I think 10 foot walls would look best.
 +
 +
== Plumbing ==
 +
 +
Shouldn't we do the plumbing first before we have to knock out drywall to run a pipe?
 +
 +
* Apparently they want to attach the shop sink to one of the sides of the kitchen walls.  The pipe can be run from outside of the kitchen.  Eric does not feel that punching a hole in the drywall is much of a concern.  He also says the door will be large enough to bring in anything the kitchen will need.