Changes

Jump to navigation Jump to search
3 bytes removed ,  01:58, 4 February 2014
no edit summary
Line 3: Line 3:     
Kevin Caughlin
 
Kevin Caughlin
      
== History ==
 
== History ==
Line 11: Line 10:  
* 2014-02-04: Sent to member's list.  
 
* 2014-02-04: Sent to member's list.  
 
* 2014-02-11: Proposed vote date.  
 
* 2014-02-11: Proposed vote date.  
      
== Background ==
 
== Background ==
    
The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate  for the space and should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space.
 
The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate  for the space and should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space.
      
== Location and Materials ==
 
== Location and Materials ==
Domain Admins
56

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu