The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate for the space and should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space.
+
The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate for the space and should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space.
== Location and Materials ==
== Location and Materials ==
Line 30:
Line 29:
== Language ==
== Language ==
−
Authorize the board to spend up to $1,800 (total) on materials stated above, and directly related costs, such as replacement band saw blades, bolts and delivery costs. The spending authority for the tool cage will expire sixty days from the day of member approval.
+
Authorize the board to spend up to $1,800 (total) on materials stated above, and directly related costs, such as replacement band saw blades, bolts and delivery costs. The spending authority for the tool cage will expire sixty days from the day of member approval.
After purchase, a copy of all receipts will be linked below.
After purchase, a copy of all receipts will be linked below.