Anonymous

Changes

From Pumping Station One
added consumables image
Line 14: Line 14:  
}}
 
}}
 
== Description ==
 
== Description ==
Will fill this in later.
+
Will fill this in later. Add work envelope and cutting capacities <br/>
 +
Tormach 1300PL manual https://tormach.com/media/asset/u/m/um10720_1300pl_0722a_web.pdf <br/>
 +
Pathpilot user guide for plasma https://tormach.com/media/asset/u/m/um10770_pathpilot_guide_plasma_0722a.pdf <br/>
 +
Hypertherm Powermax45 XP plasma cutter manual https://www.hypertherm.com/en-US/hypertherm/powermax/powermax45-xp/
 +
 
 +
==Consumables==
 +
[[File:Consumables.png|300px|thumb|center|]]
 +
== Tool Chains ==
 +
work in  progress<br/>
 +
Remote/cloud access. Pathpilot hub https://hub.pathpilot.com/about
 +
 
 +
== Use ==
 +
[[Tormach CNC Plasma Cutter Debugging]]
 +
=== Step by Step ===
 +
A work in progress, edit as needed <br/>
 +
==== Machine setup ====
 +
Make sure the table is clear of any possible obstructions. Make sure the gantry crane is clear of the machine, especially the chains.<br/>
 +
Check the slat area you will be using for any lumps of slag that would make your material not sit flat.<br/>
 +
Add water if needed to bring the level to about ¼ inch below the top of the slats. There is a 5-gallon bucket by the computer for you to use.<br/>
 +
On the control box, release the emergency stop button, turn on the master switch, and press the start button. The button should turn blue and Pathpilot should start up.<br/>
 +
Click the Pathpilot reset button.<br/>
 +
Jog the torch to an accessible location (keyboard arrows & pg up & pg dn), and remove, inspect, and reinstall the consumables as needed. Note: if you jog the machine all the way to the limit switches, you will have to restart the machine.<br/>
 +
Click the Ref Z button first, then the Ref Y & Z buttons. The torch will move to the back left corner of the table.<br/>
 +
Put your material on the table. Weight down as necessary. Attach the ground clamp.<br/>
 +
Jog the torch to where you want your job X & Y zero coordinates to be. <br/>
 +
Lower the Z axis close to your material ½ inch or so? Verify this step? <br/>
 +
Click the X,Y & Z Zero buttons.<br/>
 +
Select your material using the auto F&S selector drop downs. Note the amps required setting in the pop up window.<br/>
 +
 
 +
==== Hypertherm Plasma setup ====
 +
Turn on Hypertherm machine at the back of the Tormach, you should see three green lights.<br/>
 +
Check that Hypertherm Amps setting matches the amps required setting in the Pathpilot pop up window, adjust as necessary.<br/>
 +
 
 +
==== Run your job ====
 +
If you haven’t already, load your Gcode, click the reset button if flashing.<br/>
 +
Check the toolpath window to see if everything looks correct.<br/>
 +
You may want to do a “dry run” as a double check. (button is opposite reset)<br/>
 +
Close the curtains.<br/>
 +
Run Job. Click cycle start.<br/>
 +
        *Be prepared to click stop or hit Estop if something seems wrong*<br/>
 +
 
 +
==== Shut Down ====
 +
Set the Hypertherm plasma to 45 amps if needed and turn off the machine.<br/>
 +
Push the E stop.<br/>
 +
Turn off the main switch on the control box.<br/>
 +
Clean up around the area and put any scrap metal in the garbage can that is marked for metal scrap only.<br/>
 +
 
 +
 
 +
 
 +
== Maintenance ==
 +
(Shamelessly copied from page 58 in the manual)
 +
=== Daily ===
 +
* Clean the machine of any dust or abrasive particle buildup with a vacuum and brushes.
 +
* Wipe dust off of the linear rails with a clean cloth.
 +
=== Weekly ===
 +
* Clean all exterior surfaces with a mild cleaner.
 +
* Examine the water table's level and, if necessary, add water / rust inhibitor (GreenCut).
 +
* Check your plasma torch consumables for wear and replace if needed.
 +
=== Monthly ===
 +
* Clean the electrical cabinet vents of dust with a clean cloth or compressed air.
 +
* Remove the slats and clean sediment buildup from the bottom of the water table.
 +
=== Semi-Annually ===
 +
* Check drive belts for wear and re-tension if needed.
 +
* Remove faceplate from torch lifter and clean lead screw with a lint-free cloth.
    
== Status ==
 
== Status ==
 
1/3/23: Working great, getting ready for authorizations
 
1/3/23: Working great, getting ready for authorizations
 +
 
12/9/22: Waiting on power for the plasma torch.
 
12/9/22: Waiting on power for the plasma torch.
425

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.