Changes

Jump to navigation Jump to search
no edit summary
Line 57: Line 57:  
Here is a list of what will be purchased as part of the new gantry crane system.
 
Here is a list of what will be purchased as part of the new gantry crane system.
   −
1x [https://www.palletforks.com/workshop/cranes/1-ton-telescoping-gantry-crane/840045.html Gantry Crane 1 ton capacity]
+
1x [https://www.palletforks.com/workshop/cranes/2-ton-telescoping-gantry-crane/840047.html Gantry Crane 2 ton capacity]
   −
1x [https://www.palletforks.com/workshop/cranes/1-ton-push-trolley/840072.html Gantry Trolley 1 ton]
+
1x [https://www.palletforks.com/workshop/cranes/2-ton-push-trolley/840073.html Gantry Trolley 2 ton]
    
1x [https://www.grainger.com/product/DAYTON-Manual-Chain-Hoist-2-1VW55?opr=PDPDAM&analytics=msubItems_2Z554&position=1 Chain Hoist]
 
1x [https://www.grainger.com/product/DAYTON-Manual-Chain-Hoist-2-1VW55?opr=PDPDAM&analytics=msubItems_2Z554&position=1 Chain Hoist]
Line 69: Line 69:       −
== Why Only 1 Ton Capacity ==
+
== Why Only Partial 2 Ton Capacity ==
The main reason only 1 ton was chosen is we have a very small number of tools that weight more than 2000# and some of those tools already have moving systems built in. It was decided that for the amount it would cost to go to a 2 ton gantry and the amount of usage it would get above half its capacity would not be viable in our current economic situation.
+
This is to make the system ready for heavier use without spending a lot of money now for a capacity that may rarely if ever get used.
     
93

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu