| == Background == | | == Background == |
− | We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link). This vote will allocate the money to build-out the 3515 and modify the existing space as indicated below. | + | We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link). This Build-Out vote describes how the initial build-out of the combined spaces will occur. We allocated $5000 for buildout expenses through the 2016 budget vote. |
| | | |
| + | This Build-out vote describes The 2016 budget vote allocated $5000 for build-out expenses. |
| * HVAC | | * HVAC |
− | ** Install AC in new lounge. | + | ** Install AC in new lounge. $300 |
− | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. | + | ** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. $300 |
− | ** Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | + | ** Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. $300 |
− | ** Install ventilation duct and fan for small metals (jewelry). | + | ** Install ventilation duct and fan for small metals (jewelry). $300 |
− | ** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. | + | ** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900 |
− | ** Extend ventilation duct and add hood for hot metals. | + | ** Extend ventilation duct and add hood for hot metals. ?? |
| | | |
| * Electrical | | * Electrical |
− | ** Install new power outlets for cold metals and hot metals. Materials: conduit, wire, outlets. | + | ** Install new power outlets for woodworking, cold metals and hot metals. Materials: conduit, wire, outlets. $1500 |
− | ** Install 2 240v power outlets for woodworking.
| + | |
| | | |
| * Plumbing | | * Plumbing |
− | ** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. | + | ** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. $300 |
− | ** Install work sink at the top of the stairs next to upstairs bathroom. | + | ** Install work sink at the top of the stairs next to upstairs bathroom. $300 |
| ** Remove old sink in new lounge. | | ** Remove old sink in new lounge. |
− |
| |
− | *Install a partition between the Elston and alley sides of the new space.
| |
| | | |
| *Obtain necessary permits if they are deemed appropriate. | | *Obtain necessary permits if they are deemed appropriate. |
Line 37: |
Line 36: |
| *Move equipment to new locations. | | *Move equipment to new locations. |
| | | |
− | * Clean dust from trusses, walls, etc. in old shop. {we may want to hire this out} | + | * Clean dust from trusses, walls, etc. in 3519 shop. |
− | | |
| *Remove tool cage walls. | | *Remove tool cage walls. |
| | | |
− | *Purchase and install shelving for member storage. | + | *Purchase and install shelving for member storage. $1000 |
| | | |
| *Benches for general work area. | | *Benches for general work area. |
Line 47: |
Line 45: |
| * Compressed air for new shop. {Run tubing from old shop? Or get additional compressor? Also need air for laser/ CNC?} | | * Compressed air for new shop. {Run tubing from old shop? Or get additional compressor? Also need air for laser/ CNC?} |
| | | |
− | | + | * Rent or purchase a section of rolling scaffolding. This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. |
− | | |
− | | |
− | Expense spreadsheet:
| |
− | insert link here
| |
− | | |
− | | |
| | | |
| This vote assumes that these tasks will be performed by the landlord before we move in: | | This vote assumes that these tasks will be performed by the landlord before we move in: |
Line 60: |
Line 52: |
| *Fix roof leaks. | | *Fix roof leaks. |
| *Upgrade the lighting. | | *Upgrade the lighting. |
− | *Repair the air conditioning system.
| |
| | | |
| == Language == | | == Language == |