The lease for the adjacent building has been signed and the full members have selected by survey (at the time of this vote) one of three plans proposed by the space committee.  This vote will allocate the money to buildout the new space and modify the existing space as indicated below.
 
The lease for the adjacent building has been signed and the full members have selected by survey (at the time of this vote) one of three plans proposed by the space committee.  This vote will allocate the money to buildout the new space and modify the existing space as indicated below.
   −
Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Materials: ducting, elbows, hangers.
+
*Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Materials: ducting, elbows, hangers.
   −
[for plan 1,2] Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates.  
+
*[for plan 1,2] Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates.  
   −
[all plans] Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.
+
*[all plans] Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.
   −
Install ventilation duct and fan for the kitchen.  Use the duct currently used by the laser.
+
*Install ventilation duct and fan for the kitchen.  Use the duct currently used by the laser.
   −
Install ventilation duct and fan for small metals (jewelry).   
+
*Install ventilation duct and fan for small metals (jewelry).   
   −
Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
+
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
   −
Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing.
+
*Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing.
   −
Install a partition between the Elston and alley sides of the new space.
+
*Install a partition between the Elston and alley sides of the new space.
   −
Obtain necessary permits if they are deemed appropriate.
+
*Obtain necessary permits if they are deemed appropriate.
   −
Move equipment to new locations.
+
*Move equipment to new locations.
   −
[for plan 1,2] Clean dust from trusses, walls, etc. in old shop. {we may want to hire this out}
+
*[for plan 1,2] Clean dust from trusses, walls, etc. in old shop. {we may want to hire this out}
   −
Remove tool cage walls.
+
*Remove tool cage walls.
      Line 47: Line 47:  
This vote assumes that these tasks will be performed before we move in by the landlord:
 
This vote assumes that these tasks will be performed before we move in by the landlord:
   −
Paint the walls.
+
*Paint the walls.
Fix roof leaks.
+
*Fix roof leaks.
Upgrade the lighting.
+
*Upgrade the lighting.
Repair the air conditioning system.
+
*Repair the air conditioning system.
    