Line 21: |
Line 21: |
| ** [for plan 1,2] Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. | | ** [for plan 1,2] Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. |
| | | |
− | *[all plans] Install new power outlets for cold metals and hot metals. Materials: conduit, wire, outlets. | + | * Electrical |
| + | ** [all plans] Install new power outlets for cold metals and hot metals. Materials: conduit, wire, outlets. |
| | | |
− | *Remove temporary partition in new lounge. Paint and repair drywall if necessary. Materials: paint. | + | * Plumbing |
− | | + | ** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. |
− | *Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. | |
| | | |
| *Install a partition between the Elston and alley sides of the new space. | | *Install a partition between the Elston and alley sides of the new space. |
| | | |
| *Obtain necessary permits if they are deemed appropriate. | | *Obtain necessary permits if they are deemed appropriate. |
| + | |
| + | *Remove temporary partition in new lounge. Paint and repair drywall if necessary. Materials: paint. |
| | | |
| *Move equipment to new locations. | | *Move equipment to new locations. |
Line 38: |
Line 40: |
| | | |
| *Purchase and install shelving for member storage. | | *Purchase and install shelving for member storage. |
− |
| |
− |
| |
− |
| |
| | | |
| | | |