== Background ==
 
== Background ==
We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link).  This Build-Out vote describes how the initial build-out  of the combined spaces will occur.  We allocated $5000 for buildout expenses through the 2016 budget vote.   
+
We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link).   
   −
This Build-out vote describes  The 2016 budget vote allocated $5000 for build-out expenses.   
+
This Build-Out vote describes the initial build-out of the combined space. The type of wall or partition required to separate woodworking and hot metals has not been determined, so an estimate for that is not included. A vote for additional money for the wall may be necessary. 
* HVAC
+
 
 +
The 2016 budget vote allocated $5000 for build-out. The expenses for the activities listed below should fall within that budget.  If there are unforeseen expenses another vote may be necessary.
 +
   
 +
* HVAC
 
** Install AC in new lounge. $300
 
** Install AC in new lounge. $300
 
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $300
 
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $300
Line 29: Line 32:  
** Install work sink at the top of the stairs next to upstairs bathroom. $300
 
** Install work sink at the top of the stairs next to upstairs bathroom. $300
 
** Remove old sink in new lounge.
 
** Remove old sink in new lounge.
 
+
** Compressed air for the
 
*Obtain necessary permits if they are deemed appropriate.
 
*Obtain necessary permits if they are deemed appropriate.
   
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
 
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
   
*Move equipment to new locations.
 
*Move equipment to new locations.
 
+
* Vacuum dust from trusses, walls, etc. in 3519 shop.  
* Clean dust from trusses, walls, etc. in 3519 shop.  
   
*Remove tool cage walls.
 
*Remove tool cage walls.
 
+
*Purchase and install shelving for member storage. $500
*Purchase and install shelving for member storage. $1000
  −
   
*Benches for general work area.
 
*Benches for general work area.
 
+
* Run compressed air for the laser and hot metals. $300
* Compressed air for new shop. {Run tubing from old shop? Or get additional compressor? Also need air for laser/ CNC?}
+
* Rent or purchase a section of rolling scaffolding.  This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. $300
 
  −
* Rent or purchase a section of rolling scaffolding.  This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning.  
      
This vote assumes that these tasks will be performed  by the landlord before we move in:
 
This vote assumes that these tasks will be performed  by the landlord before we move in: