Changes

Jump to navigation Jump to search
Line 18: Line 18:  
* HVAC
 
* HVAC
 
** Install AC in new lounge. $300
 
** Install AC in new lounge. $300
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $300
+
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Makeup air? Materials: ducting, elbows, hangers. $400
** Install ventilation duct, fan and hood for the kitchen.  Use the duct currently used by the laser. $300
+
** Install ventilation duct, fan and hood for the kitchen.  Use the duct currently used by the laser. $250
** Install ventilation duct and fan for small metals (jewelry).  $300
+
** Install ventilation duct and fan for small metals (jewelry).  $250
 
** Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900
 
** Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. $900
 
** Extend ventilation duct and add hood for hot metals. $400
 
** Extend ventilation duct and add hood for hot metals. $400
Line 31: Line 31:  
** Install work sink at the top of the stairs next to upstairs bathroom. $300
 
** Install work sink at the top of the stairs next to upstairs bathroom. $300
 
** Remove old sink in new lounge.
 
** Remove old sink in new lounge.
** Compressed air for the laser and hot metals. $300
+
** Compressed air lines for the laser and hot metals. $250
    
* Partition between hot metals and woodworking in 3515.
 
* Partition between hot metals and woodworking in 3515.
Line 52: Line 52:  
*Fix roof leaks.
 
*Fix roof leaks.
 
*Upgrade the lighting.
 
*Upgrade the lighting.
 +
 +
Sub total: $7750
 +
        + 20% contingency funds
 +
        - $5000 already allocated
 +
Total      $4300
    
== Language ==
 
== Language ==
Domain Admins
586

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu