Line 16: Line 16:     
<ol>
 
<ol>
<li>Donated Commercial Stove - Free, will install in-house.</li>
+
<li>Donated Commercial Range - Free, will install in-house.</li>
* Commercial Stove Vent Hood $1000.00 - Shelly and Gerald located a commercial stove vent hood in great condition at Evanston Rebuilders Warehouse.  It is being held without deposit for up to two weeks.  If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial stove vent hood (4000.00).
+
* Commercial Range Vent Hood $1500.00 - New Commercial Range Hood
* Install a 10" ventilation duct for the commercial stove in the kitchen - $300.00.
+
Used may be missing insert - Shelly and Gerald located a residential stove vent hood in great condition at Evanston Rebuilders Warehouse.  It is being held without deposit for up to two weeks.  If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial range vent hood.
* Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial stove.
+
* Install a 10" ventilation duct for the commercial range in the kitchen - $300.00.
 +
* Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range.
 
<li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church.  Upper and lower cabinets will be installed in this new dining area.</li>
 
<li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church.  Upper and lower cabinets will be installed in this new dining area.</li>
 
<li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li>
 
<li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li>
Line 40: Line 41:  
</ol>
 
</ol>
 
   
 
   
Sub total: $3000
+
Sub total: $3500
 
         plus 20% contingency funds         
 
         plus 20% contingency funds         
Total      $3600.00
+
Total      $4200.00
    
== Language ==
 
== Language ==
   −
We authorize the board to spend up to $3600.00 for equipment, materials and supplies to renovate the kitchen.  
+
We authorize the board to spend up to $4200.00 for equipment, materials and supplies to renovate the kitchen.  
    
The funding for this vote will expire 6 months from the date of approval.
 
The funding for this vote will expire 6 months from the date of approval.