== Down Drops ==
 
== Down Drops ==
 
Each large machine or cluster of small machines will require a down drop from the main duct to the machine port or manifold. The drop will require:  
 
Each large machine or cluster of small machines will require a down drop from the main duct to the machine port or manifold. The drop will require:  
*8x8x6 DWV PVC Wye fitting  (the last drop on the main could use a 8"45 & 8" to 6" reducer instead of a wye.  this would probably be cheaper the the wye plus a cap.
+
*8x8x6 DWV PVC Wye fitting  (the last drop on the main could use a 8"45 & 8" to 6" reducer instead of a wye.  this would probably be cheaper the the wye plus a cap.)
 
*6" 45 elbow
 
*6" 45 elbow
 
*approximately 5' of 6" PVC pipe
 
*approximately 5' of 6" PVC pipe