The current tool cage that Pumping Station:One inherited from the previous occupant must be demolished and replaced as soon as is practical. The cage is inadequate for the space, has multiple code violations and is a fire hazard. It should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space.
+
The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate and has several code and safety violations; for example,
 +
 
 +
== Electrical Code ==
 +
The two electrical panels do not have thirty-six inches of clearance mandated by electrical code.
 +
 
 +
== Fire Hazard ==
 +
There is flammable material on and around the panels; this is not a good situation in a workshop that has a history of electrical fires,
 +
 
 +
== Safety ==
 +
It is unsafe for two people to occupy the cage at the same time.
 +
 
 +
 
 +
It should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space as soon as is practice.
    
== Location and Materials ==
 
== Location and Materials ==