Anonymous

Changes

From Pumping Station One
4 bytes removed ,  05:00, 18 July 2014
m
Robot: Cosmetic changes
Line 20: Line 20:     
* Moved the stack of white bins with sandpaper, fasteners, etc next to the bins behind the Laser computer
 
* Moved the stack of white bins with sandpaper, fasteners, etc next to the bins behind the Laser computer
* Organized the loose tools into the large red Craftsman rolling tool chest. I was unable to label the drawers today as the labeler was out of labels. I will put labels to help out, but here is the basic layout (I may have reversed one):
+
* Organized the loose tools into the large red Craftsman rolling tool chest. I was unable to label the drawers today as the labeler was out of labels. I will put labels to help out, but here is the basic layout (I may have reversed one):
 
** Top: safety equipment: glasses, goggles, masks, etc.
 
** Top: safety equipment: glasses, goggles, masks, etc.
 
** 1st Chest Drawer: small tools currently small screwdrivers and driver bits
 
** 1st Chest Drawer: small tools currently small screwdrivers and driver bits
Line 36: Line 36:  
* I tried to leave a set of single tools on the pegboard for quick usage
 
* I tried to leave a set of single tools on the pegboard for quick usage
   −
Next up I will start to tackle the fasteners.
+
Next up I will start to tackle the fasteners.  
    
And learn to do something useful on the laser cutter to better organize the drawers.
 
And learn to do something useful on the laser cutter to better organize the drawers.
WikiBots
1,397

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.