Line 12: |
Line 12: |
| ** we should also get a compressed water extinguisher for putting out clothes | | ** we should also get a compressed water extinguisher for putting out clothes |
| * real first aid kit | | * real first aid kit |
| + | ** Done - mounted by the door to the kitchen, along with a burn kit and bloodborne pathogen kit --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
| ** 12 inch square acrylic mirrror next to it | | ** 12 inch square acrylic mirrror next to it |
| * safety gear wall | | * safety gear wall |
− | ** can we put it on the wall outside? | + | ** More or less in place as of this writing --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
− | * If we keep the table saw, we need to see if Steve has the blade guard to put back on or we need to buy a new one.
| |
| * Emergency shower (rumoured to be in the works) | | * Emergency shower (rumoured to be in the works) |
| | | |
| == Infrastructure == | | == Infrastructure == |
| * better lighting | | * better lighting |
− | ** get better bulbs and a new fixture | + | ** Shop lighting is much improved --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
| ** under cabinet lighting | | ** under cabinet lighting |
| ** emergency light | | ** emergency light |
− | ** Skylight? [http://www.solatube.com solatubes are nifty] | + | *** Sevin is currently working on a plan --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
| * ventilation | | * ventilation |
| ** fumes for welding, etc. | | ** fumes for welding, etc. |
Line 30: |
Line 30: |
| *** a switch needs to turn on both the axial fan and the fan in the main garage | | *** a switch needs to turn on both the axial fan and the fan in the main garage |
| ** dust collection from saws | | ** dust collection from saws |
| + | *** Dust collector is in place and being routed various places --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
| * power | | * power |
| ** we have 2 outlets with 220 V (in the middle of the shop, one on each side) | | ** we have 2 outlets with 220 V (in the middle of the shop, one on each side) |
Line 37: |
Line 38: |
| *** TIG (GTAW) Welder | | *** TIG (GTAW) Welder |
| *** end mill (that we're going to get, right?) | | *** end mill (that we're going to get, right?) |
| + | **** Bridgeport installed and powered --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
| *** lathe (also that we're going to get) | | *** lathe (also that we're going to get) |
| + | **** clausing runs on 110v --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) |
| ** are outlets on multiple circuits? | | ** are outlets on multiple circuits? |
| ** extension cord reels hanging from ceilings (at least one for each workbench) | | ** extension cord reels hanging from ceilings (at least one for each workbench) |