Line 9: Line 9:     
== Background ==
 
== Background ==
The lease for the adjacent building has been signed and the full members have selected by survey (by the time of this vote) one of three plans developed by the space committee.  This vote will allocate the money to buildout the new space.  
+
The lease for the adjacent building has been signed and the full members have selected by survey (at the time of this vote) one of three plans proposed by the space committee.  This vote will allocate the money to buildout the new space and modify the existing space as indicated below.
    +
Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser.  The roof perforation will be done by a professional roofer.  Interior ducting can be done by volunteers.  Materials: ducting, elbows, hangers.
 +
 +
Move or expand dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates.
 +
 +
Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.
 +
 +
Install ventilation duct and fan for small metals (jewelry). 
 +
 +
Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
 +
 +
Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing.
 +
 +
 +
 +
Expense spreadsheet:
 +
insert link here
 +
 +
 +
 +
This vote assumes that these tasks will be performed before we move in by the landlord:
 +
 +
Paint the walls.
 +
Fix roof leaks.
 +
Upgrade the lighting.
 +
Repair the air conditioning system.
    