Changes

Jump to navigation Jump to search
no edit summary
Line 9: Line 9:  
|arrived = Oct. 16, 2021
 
|arrived = Oct. 16, 2021
 
|where = Boiler Room
 
|where = Boiler Room
|doesitwork = yes}}
+
|doesitwork = yes
 +
|image = Schulz-compressor.jpg}}
 
The [[Schultz air compressor]] is a 10 hp two-stage compressor that feeds the shop air for both the 3719 and 3717 buildings. It was purchased to replace the [[Quincy Air Compressor]], which broke down August 26, 2021, and could not be economically repaired.
 
The [[Schultz air compressor]] is a 10 hp two-stage compressor that feeds the shop air for both the 3719 and 3717 buildings. It was purchased to replace the [[Quincy Air Compressor]], which broke down August 26, 2021, and could not be economically repaired.
  
1,582

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu