Difference between revisions of "Kegerator"

From Pumping Station One
Jump to navigation Jump to search
m (Robot: Cosmetic changes)
 
Line 1: Line 1:
[[Category:Past Projects]]
 
 
== Concept ==
 
== Concept ==
 
This is what I envision as our final kegerator set up:
 
This is what I envision as our final kegerator set up:
Line 8: Line 7:
  
 
With the front mounted tap set up from the first link, using the
 
With the front mounted tap set up from the first link, using the
materials/construction instructions from the second. Once we gather
+
materials/construction instructions from the second. Once we gather
 
the materials we should be able to get it together in a couple days.
 
the materials we should be able to get it together in a couple days.
 
That said, I would like to have it set up for at least one beer by the
 
That said, I would like to have it set up for at least one beer by the
time our P-P-Power Ale is ready to drink. This will save us the
+
time our P-P-Power Ale is ready to drink. This will save us the
 
pleasure of a bottling party, and enable us to drink it in a day or
 
pleasure of a bottling party, and enable us to drink it in a day or
 
so, rather than waiting for a secondary fermentation.
 
so, rather than waiting for a secondary fermentation.
Line 20: Line 19:
 
ft.)
 
ft.)
  
- 1 x 6's (also about 16 ft)
+
- 1 x 6's (also about 16 ft)
  
 
- Polyurethane/stain of some sort
 
- Polyurethane/stain of some sort
Line 47: Line 46:
  
 
- 16 x hose clamps
 
- 16 x hose clamps
 +
 +
[[Category:Past Projects]]

Latest revision as of 00:12, 18 March 2014

Concept

This is what I envision as our final kegerator set up:

[1]

[2]

With the front mounted tap set up from the first link, using the materials/construction instructions from the second. Once we gather the materials we should be able to get it together in a couple days. That said, I would like to have it set up for at least one beer by the time our P-P-Power Ale is ready to drink. This will save us the pleasure of a bottling party, and enable us to drink it in a day or so, rather than waiting for a secondary fermentation.

Materials

- 2 x 4 's ( I haven't measured yet, but I estimate about about 16 ft.)

- 1 x 6's (also about 16 ft)

- Polyurethane/stain of some sort

- Silicone sealant

- CO2 tank and regulator (Steve is letting us use his for the time being, but we need to eventually purchase our own)

- (4) Beer faucets w/ levers

- (4) 3" shanks with nipple assemblies

- 20 Feet 5/16" Vinyl Gas Tubing (5' per tap)

- 20 Feet 3/16" Beverage Tubing (5' per tap)

- 4 x Liquid Quick Disconnects

- 4 x Gas Quick Disconnects

- 4-Way Gas Manifold

- Temperature controller

- 2 x cornelius keg ( I think John said we can borrow these from him)

- 16 x hose clamps