Anonymous

Changes

From Pumping Station One
1,973 bytes removed ,  00:12, 21 August 2015
Line 8: Line 8:  
People interested in cleaning up PS:One should add tasks that need to be completed to the area lists below. These list may be better suited for an app like Trello (PS:One's Trello doesn't exist anymore?).
 
People interested in cleaning up PS:One should add tasks that need to be completed to the area lists below. These list may be better suited for an app like Trello (PS:One's Trello doesn't exist anymore?).
   −
==General Area==
+
[[Recurring_Maintenance | Recurring Maintenance]]
===Recurring Tasks===
  −
*Move items in the Wut Zone to Limbo
  −
*Throw out / Recycle Limbo items.
  −
*Dust the top of the dust collections pipes
  −
*Empty the dust collector bins and clean the filter stack by connecting a vacuum to the cleanout port.
  −
*Audit member shelves.
  −
*Change filter in upstairs HVAC (every 30 days): [[HVAC#Filter]].
  −
*Oil the pumps in the boiler room (annually): [[HVAC#Pumps]].
     −
===Non-Recurring Tasks===
+
[[Area_Improvements_and_Projects | Area Improvements and Projects]]
*Paint the back stairwell railings, main doorways.
  −
*Fix the Tardis
  −
*Fix the ventilation fan in the shop that doesn't spin up.
  −
*Replace the orange table in the middle of the shop (it's becoming unstable)
  −
*Tidy Space stuff under the orange table
  −
*Replace dust collector impeller shroud clips as they all have hairline fractures
  −
*Make a dust cover for the SEM (Craft help?)
     −
==CNC Area==
+
=Other Lists=
===Recurring Tasks===
+
The following link(s) are to other lists that may or may not have tasks that need to be accomplished in the Shop. Ideally, one list each for recurring and non-recurring tasks should exist. Consider merging these lists into the above links.
*Grease Shopbot rails
  −
*Clean underneath and around Shopbot
  −
*Remove ticketed materials from
  −
**under the Shopbot
  −
**under the Shapeoko
  −
*Organize vinyl
     −
===Non-Recurring Tasks===
+
[[Shop_Improvements | Shop Improvements]]
*Move laser desk perpendicular to the kitchen wall, behind the flammables cabinet.
  −
*Move Shapeoko desk and computer perpendicular to the long kitchen wall just outside the kitchen opening on the laser side of the shop.
  −
*Move all 3D printers along the wall parallel to Elston Ave
  −
*Build a rack for printer and vinyl cutter and place along the wall perpendicular to Elston Ave
  −
*Build a spool rack that holds all filament spools above the 3D printers.
  −
*Replace Shopbot table top.
     −
==Electronics Area==
+
[[Trello | Trello]] : https://trello.com/pumpingstationone
===Recurring Tasks===
  −
===Non-Recurring Tasks===
  −
 
  −
==Crafts Area==
  −
===Recurring Tasks===
  −
===Non-Recurring Tasks===
  −
 
  −
==Hot Metals Area==
  −
===Recurring Tasks===
  −
===Non-Recurring Tasks===
  −
*Flip middle limbo wall to create storage for Hot Metals.
  −
*Exhaust gas ventilation to outside.
  −
 
  −
==Cold Metals Area==
  −
===Recurring Tasks===
  −
*Lubricate the manual Bridgeport milling machine head.
  −
*Grease Doall bandsaw (1 zerk under big metal cover).
  −
*Grease Johnson bandsaw (2 zerks on pivot shaft).
  −
 
  −
===Non-Recurring Tasks===
  −
 
  −
==Wood Shop Area==
  −
===Recurring Tasks===
  −
===Non-Recurring Tasks===
  −
*Add dust collection drop for new planer.  May need to order elbows, 6" blast gate, 6" flanges.
  −
*Add floor sweep inlet for the dust collector
  −
 
  −
==Tool Cage Area==
  −
===Recurring Tasks===
  −
===Non-Recurring Tasks===
  −
 
  −
==Kitchen Area==
  −
===Recurring Tasks===
  −
===Non-Recurring Tasks===
  −
*Add sliding door to kitchen (check fire codes)
  −
*Seal gap between catwalk and wall.
 
1,238

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.