Difference between revisions of "Board Meeting Notes 2012-06-26"
Jump to navigation
Jump to search
m (Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3)) |
|||
(9 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Board Meeting Notes | {{Board Meeting Notes | ||
− | | Previous MM-DD- | + | | Previous YYYY-MM-DD=2012-06-19 |
| Current YY-MM-DD=06-26-2012 | | Current YY-MM-DD=06-26-2012 | ||
− | | Next MM-DD- | + | | Next YYYY-MM-DD=2012-07-03 |
| YYYY=2012}} | | YYYY=2012}} | ||
− | Meeting start: | + | Meeting start: 07:30 pm |
− | ===Attendance=== | + | === Attendance === |
* Tim Saylors | * Tim Saylors | ||
Line 13: | Line 13: | ||
* Ishmael Rufus | * Ishmael Rufus | ||
* Steve Finkelman | * Steve Finkelman | ||
− | * | + | * Patrick Callahan |
− | ===Agenda=== | + | === Agenda === |
− | ====Old Business==== | + | ==== Old Business ==== |
* Dumpster service setup | * Dumpster service setup | ||
* Network roll-out status | * Network roll-out status | ||
+ | * Remaining things we need from the new landlord | ||
− | ====New Business==== | + | ==== New Business ==== |
* Financial/membership report | * Financial/membership report | ||
Line 28: | Line 29: | ||
* pick up the vacuum former | * pick up the vacuum former | ||
− | ===Minutes=== | + | === Minutes === |
+ | * Shawn will sign up with WM for dumpster service unless another one has a shorter contract requirement. | ||
+ | * Internet service is working ok but still needs improvement. | ||
+ | ** Rhys is working with Warren to improve the microwave connection | ||
+ | ** Rhys is continuing to roll out more cables | ||
+ | ** Rhys is working on improving redundancy of service | ||
+ | * Ishmael gave the financial report | ||
+ | * Membership Report - 135 | ||
+ | ** Full: 58 | ||
+ | ** Starving: 77 | ||
+ | * A representative from a college has offered to pay the space if we are willing to laser cut designs from the summer class | ||
+ | * Mitch Altman will be teaching the Arduino class. | ||
+ | * Stuff we need from the new landlord | ||
+ | ** we need to get him to remove the rest of his stuff | ||
+ | ** we need to get him to fix the AC for the warehouse area | ||
+ | ** we need to get written confirmation from him that he is giving us the stuff he is leaving as a permanent donation. | ||
+ | *** we could do this by giving him the paperwork for 501c3 tax deduction | ||
− | + | Meeting End: 07:55 pm | |
− | Meeting End: |
Latest revision as of 18:50, 29 March 2014
Board Meeting Minutes | ||
---|---|---|
<< Board Meeting Notes 2012-06-19 | 2012 Board Meetings | Board Meeting Notes 2012-07-03 >> |
Meeting start: 07:30 pm
Attendance
- Tim Saylors
- Shawn Blaszak
- Ishmael Rufus
- Steve Finkelman
- Patrick Callahan
Agenda
Old Business
- Dumpster service setup
- Network roll-out status
- Remaining things we need from the new landlord
New Business
- Financial/membership report
- new members pending on the mailing list.
- pick up the vacuum former
Minutes
- Shawn will sign up with WM for dumpster service unless another one has a shorter contract requirement.
- Internet service is working ok but still needs improvement.
- Rhys is working with Warren to improve the microwave connection
- Rhys is continuing to roll out more cables
- Rhys is working on improving redundancy of service
- Ishmael gave the financial report
- Membership Report - 135
- Full: 58
- Starving: 77
- A representative from a college has offered to pay the space if we are willing to laser cut designs from the summer class
- Mitch Altman will be teaching the Arduino class.
- Stuff we need from the new landlord
- we need to get him to remove the rest of his stuff
- we need to get him to fix the AC for the warehouse area
- we need to get written confirmation from him that he is giving us the stuff he is leaving as a permanent donation.
- we could do this by giving him the paperwork for 501c3 tax deduction
Meeting End: 07:55 pm