Difference between revisions of "2014 and Beyond Building Shopping"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
=== Power === | === Power === | ||
+ | * Ample household circuits in all rooms - at least 2 20A circuits per room for lounge/classroom. 4 20A circuits for electronics. 8+ 20A circuits in shop, to be distributed by overhead cord reels, in addition to circuits for tools. | ||
+ | |||
+ | * 3 phase is a must. Bonus points for disconnects in place around shop space | ||
+ | |||
+ | * | ||
+ | |||
=== Rooms === | === Rooms === | ||
+ | * Multiple single-occupancy bathrooms at minimum. | ||
+ | |||
+ | * Shower in one of those bathrooms is a plus | ||
=== Other utilities === | === Other utilities === | ||
== Parking == | == Parking == |
Revision as of 01:37, 2 March 2014
PS:1 will not be able to fit in its current space forever. Opinions on when the move should happen are varied, but we should enter any process well-informed and ready to make a good decision.
Location
- Close to CTA is important
Space requirements
Existing amenities
Power
- Ample household circuits in all rooms - at least 2 20A circuits per room for lounge/classroom. 4 20A circuits for electronics. 8+ 20A circuits in shop, to be distributed by overhead cord reels, in addition to circuits for tools.
- 3 phase is a must. Bonus points for disconnects in place around shop space
Rooms
- Multiple single-occupancy bathrooms at minimum.
- Shower in one of those bathrooms is a plus