Difference between revisions of "2014 and Beyond Building Shopping"

From Pumping Station One
Jump to navigation Jump to search
Line 11: Line 11:
  
 
=== Power ===
 
=== Power ===
 +
* Ample household circuits in all rooms - at least 2 20A circuits per room for lounge/classroom. 4 20A circuits for electronics. 8+ 20A circuits in shop, to be distributed by overhead cord reels, in addition to circuits for tools.
 +
 +
* 3 phase is a must. Bonus points for disconnects in place around shop space
 +
 +
*
 +
  
 
=== Rooms ===
 
=== Rooms ===
 +
* Multiple single-occupancy bathrooms at minimum.
 +
 +
* Shower in one of those bathrooms is a plus
  
 
=== Other utilities ===
 
=== Other utilities ===
  
 
== Parking ==
 
== Parking ==

Revision as of 01:37, 2 March 2014

PS:1 will not be able to fit in its current space forever. Opinions on when the move should happen are varied, but we should enter any process well-informed and ready to make a good decision.


Location

  • Close to CTA is important

Space requirements

Existing amenities

Power

  • Ample household circuits in all rooms - at least 2 20A circuits per room for lounge/classroom. 4 20A circuits for electronics. 8+ 20A circuits in shop, to be distributed by overhead cord reels, in addition to circuits for tools.
  • 3 phase is a must. Bonus points for disconnects in place around shop space


Rooms

  • Multiple single-occupancy bathrooms at minimum.
  • Shower in one of those bathrooms is a plus

Other utilities

Parking