Difference between revisions of "Vote to buy a new UPS"
Jump to navigation
Jump to search
Line 61: | Line 61: | ||
* Backup Time: ?? | * Backup Time: ?? | ||
* Cost: ?? | * Cost: ?? | ||
+ | |||
+ | === Options === | ||
+ | |||
+ | {| class="wikitable" | ||
+ | ! Device | ||
+ | ! VA/Watt | ||
+ | ! Price | ||
+ | |- | ||
+ | | APC Smart-UPS RM SMT3000RM2U | ||
+ | | 3000VA/2700W | ||
+ | | [http://www.amazon.com/APC-Smart-UPS-SMT3000RM2U-3000VA-System/dp/B004F0BD2K/ $1,151.99] | ||
+ | |- | ||
+ | | CyberPower PR3000LCDRT2U | ||
+ | | 3000VA/2250W | ||
+ | | [http://www.amazon.com/gp/product/B001RJGDXQ $760.99] | ||
+ | |} | ||
== Language == | == Language == |
Revision as of 00:14, 8 September 2014
This may not come to a vote, It may be purchased under a "maintaining infrastructure" clause in the budget/bylaws.
That said, it is a lot of relatively expensive equipment being discussed.
Sponsors
History
Background
Our UPS is failing.
- http://www.amazon.com/APC-Smart-UPS-SMT3000RM2U-3000VA-System/dp/B004F0BD2K/
- http://www.amazon.com/gp/product/B001RJGDXQ
On Current Load, we can only run 2 out of 4 hypervisors running. The 2 that are on are nearing capacity.
Turning on a 3rd hypervisor triggers the overloaded alarm on the existing UPS.
Current Utilization
Anthony Measured the power consumption of existing rack infrastructure.
Device | Wattage |
---|---|
KVM | 10W |
Motorola SURFboard | 20W |
Dell Power Edge | 331 W, (Rated for 670 Watts) |
Dell Power Edge | 331 W, (Rated for 670 Watts) |
Dell Power Edge | 331 W, (Rated for 670 Watts) |
Dell Power Edge | 331 W, (Rated for 670 Watts) |
SAN | 427W |
HP Procurve | 340W |
Serial Console | 20W |
desired feature set
- Number of Outlets: 7-8
- There are 2 power runs in the rack, fewer may be ok
- Interface Port Type: USB
- Backup Time: ??
- Cost: ??
Options
Device | VA/Watt | Price |
---|---|---|
APC Smart-UPS RM SMT3000RM2U | 3000VA/2700W | $1,151.99 |
CyberPower PR3000LCDRT2U | 3000VA/2250W | $760.99 |