Difference between revisions of "2015 Budget Vote/CNC Area Budget"
Jump to navigation
Jump to search
Ps1giovanni (talk | contribs) (Created page with "{| class="wikitable" |colspan="5"| Area Budget Proposal |---- | | | | | |---- |Area: |CNC Area | | | |---- |Prepared by: |Elizabeth Koprucki | | | |---- | | | | | |---- |Accou...") |
Ps1giovanni (talk | contribs) |
||
Line 169: | Line 169: | ||
| | | | ||
|$200.00 | |$200.00 | ||
+ | |---- | ||
+ | |} | ||
+ | |||
+ | |||
+ | {| class="wikitable" | ||
+ | |Furniture | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |---- | ||
+ | |Description | ||
+ | |Costs of furniture for the area | ||
+ | | | ||
+ | | | ||
+ | |---- | ||
+ | |Item | ||
+ | |Description | ||
+ | |Annual Cost | ||
+ | |Monthly Cost | ||
+ | |---- | ||
+ | |Work bench | ||
+ | |Work bench | ||
+ | | $ 100.00 | ||
+ | | | ||
|---- | |---- | ||
|} | |} |
Revision as of 04:05, 15 January 2015
Area Budget Proposal | ||||
Area: | CNC Area | |||
Prepared by: | Elizabeth Koprucki | |||
Account Breakdown | ||||
Expenses | ||||
Account | Monthly | Annual | Annual Total | |
Advertising | $ - | $ - | $ - | |
Disposal Fees | $ - | $ - | $ - | |
Education | $ - | $ 350.00 | $ 350.00 | |
Equipment | $ 200.00 | $ 100.00 | $ 2,500.00 | |
Furniture | $ - | $ 100.00 | $ 100.00 | |
Job Materials | $ - | $ - | $ - | |
Repair & Maintenance | $ - | $ 1,200.00 | $ 1,200.00 | |
Safety Equipment | $ - | $ - | $ - | |
Supplies | $ - | $ 2,730.00 | $ 2,730.00 | |
Tools | $ - | $ 20.00 | $ 20.00 | Total Budget Required |
Total | $ 200.00 | $ 4,500.00 | $ 6,900.00 | $ 6,900.00 |
Education | |||
Description | Costs of books/classes or other education materials for the area | ||
Item Name | Item Description | Annual Cost | Monthly Cost |
Books | New Books for the library | $ 100.00 | |
Training Classes | Training classes with external instructors | $ 250.00 |
Equipment | |||
Description | Large Long Lived Equipment | ||
Equipment Name | Equipment Description | Annual Cost | Monthly Cost |
Shopvac | Shopvac for Small CNC Router Dust Collection | $100.00 | |
Laser Cutter Loan | Repayment on the loan for the laser cutter | $200.00 |
Furniture | |||
Description | Costs of furniture for the area | ||
Item | Description | Annual Cost | Monthly Cost |
Work bench | Work bench | $ 100.00 |