Difference between revisions of "Area Host Meeting Notes 11-06-2012"

From Pumping Station One
Jump to navigation Jump to search
(Created page with '{{Area Host Meeting Notes | Previous MM-DD-YYYY= | Current YY-MM-DD=11-06-2012 | Next MM-DD-YYYY= | YYYY=2012}} In attendance: Agenda: Minutes:')
 
m (Robot: Cosmetic changes)
 
(7 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
| Previous MM-DD-YYYY=
 
| Previous MM-DD-YYYY=
 
| Current YY-MM-DD=11-06-2012  
 
| Current YY-MM-DD=11-06-2012  
| Next MM-DD-YYYY=
+
| Next MM-DD-YYYY=11-27-2012
 
  | YYYY=2012}}
 
  | YYYY=2012}}
  
 
In attendance:
 
In attendance:
 +
 +
* Anna Yu
 +
* Adrianna McKinley
 +
* Colin Parsons
 +
* Tim Saylor
 +
* Rhys
 +
* Steve Suspenders
 +
* Steve Indiana
 +
* Shawn
  
  
 
Agenda:
 
Agenda:
 +
 +
* Successes / concerns / requests from area hosts
 +
* List of essential infrastructure
  
  
 
Minutes:
 
Minutes:
 +
 +
* The wood shop and metal shop should be two separate areas
 +
 +
* The certification program is broken.
 +
** too many people are using things without certification
 +
** Nobody enforces required certification
 +
** How do I get certified is the next question. We have to have an answer. Once a month classes?
 +
** There's a lot of latent demand for certification, especially in the metal shop.
 +
** The current problem is awareness of the options available for learning things.
 +
** Signs used to work in the old shop, maybe we need more signs. With people's pictures on them.
 +
** Set up machines with rfid readers to prevent uncertified users
 +
** grace period after certification where a trainer checks their setup before they start working?
 +
** Need a simplified manual for the tools that users can learn from on their own.
 +
** Give them a physical copy of the manuals.
 +
 +
* We should get a vending machine for tooling / electronic parts
 +
 +
* Area hosts should provide a list of essential infrastructure by our next meeting
 +
 +
* Should we use the wiki or something easier? (google docs?)
 +
 +
* Next meeting in three weeks. (All area hosts' TODO)
 +
 +
* create a google group and public email forward to the area hosts. (Tim's TODO)
 +
 +
Edit 11/26/12:
 +
Additional important issues that were identified:
 +
* member / project storage policies
 +
* corporate accounts with suppliers

Latest revision as of 14:12, 17 March 2014


Area Host Meeting Minutes
<< Area Host Meeting Notes 2012 Area Host Meetings Area Host Meeting Notes 11-27-2012 >>

In attendance:

  • Anna Yu
  • Adrianna McKinley
  • Colin Parsons
  • Tim Saylor
  • Rhys
  • Steve Suspenders
  • Steve Indiana
  • Shawn


Agenda:

  • Successes / concerns / requests from area hosts
  • List of essential infrastructure


Minutes:

  • The wood shop and metal shop should be two separate areas
  • The certification program is broken.
    • too many people are using things without certification
    • Nobody enforces required certification
    • How do I get certified is the next question. We have to have an answer. Once a month classes?
    • There's a lot of latent demand for certification, especially in the metal shop.
    • The current problem is awareness of the options available for learning things.
    • Signs used to work in the old shop, maybe we need more signs. With people's pictures on them.
    • Set up machines with rfid readers to prevent uncertified users
    • grace period after certification where a trainer checks their setup before they start working?
    • Need a simplified manual for the tools that users can learn from on their own.
    • Give them a physical copy of the manuals.
  • We should get a vending machine for tooling / electronic parts
  • Area hosts should provide a list of essential infrastructure by our next meeting
  • Should we use the wiki or something easier? (google docs?)
  • Next meeting in three weeks. (All area hosts' TODO)
  • create a google group and public email forward to the area hosts. (Tim's TODO)

Edit 11/26/12: Additional important issues that were identified:

  • member / project storage policies
  • corporate accounts with suppliers