Difference between revisions of "Area Host Meeting Notes 11-06-2012"
From Pumping Station One
m (Robot: Cosmetic changes) |
|||
(5 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
| Previous MM-DD-YYYY= | | Previous MM-DD-YYYY= | ||
| Current YY-MM-DD=11-06-2012 | | Current YY-MM-DD=11-06-2012 | ||
− | | Next MM-DD-YYYY= | + | | Next MM-DD-YYYY=11-27-2012 |
| YYYY=2012}} | | YYYY=2012}} | ||
Line 12: | Line 12: | ||
* Tim Saylor | * Tim Saylor | ||
* Rhys | * Rhys | ||
− | * Steve | + | * Steve Suspenders |
+ | * Steve Indiana | ||
* Shawn | * Shawn | ||
+ | |||
Agenda: | Agenda: | ||
Line 28: | Line 30: | ||
** too many people are using things without certification | ** too many people are using things without certification | ||
** Nobody enforces required certification | ** Nobody enforces required certification | ||
− | ** How do I get certified is the next question. | + | ** How do I get certified is the next question. We have to have an answer. Once a month classes? |
** There's a lot of latent demand for certification, especially in the metal shop. | ** There's a lot of latent demand for certification, especially in the metal shop. | ||
** The current problem is awareness of the options available for learning things. | ** The current problem is awareness of the options available for learning things. | ||
− | ** Signs used to work in the old shop, maybe we need more signs. | + | ** Signs used to work in the old shop, maybe we need more signs. With people's pictures on them. |
** Set up machines with rfid readers to prevent uncertified users | ** Set up machines with rfid readers to prevent uncertified users | ||
** grace period after certification where a trainer checks their setup before they start working? | ** grace period after certification where a trainer checks their setup before they start working? | ||
Line 41: | Line 43: | ||
* Area hosts should provide a list of essential infrastructure by our next meeting | * Area hosts should provide a list of essential infrastructure by our next meeting | ||
− | * Should we use the wiki or something easier? | + | * Should we use the wiki or something easier? (google docs?) |
− | * Next meeting in three weeks. | + | * Next meeting in three weeks. (All area hosts' TODO) |
* create a google group and public email forward to the area hosts. (Tim's TODO) | * create a google group and public email forward to the area hosts. (Tim's TODO) | ||
+ | |||
+ | Edit 11/26/12: | ||
+ | Additional important issues that were identified: | ||
+ | * member / project storage policies | ||
+ | * corporate accounts with suppliers |
Latest revision as of 14:12, 17 March 2014
Area Host Meeting Minutes | ||
---|---|---|
<< Area Host Meeting Notes | 2012 Area Host Meetings | Area Host Meeting Notes 11-27-2012 >> |
In attendance:
- Anna Yu
- Adrianna McKinley
- Colin Parsons
- Tim Saylor
- Rhys
- Steve Suspenders
- Steve Indiana
- Shawn
Agenda:
- Successes / concerns / requests from area hosts
- List of essential infrastructure
Minutes:
- The wood shop and metal shop should be two separate areas
- The certification program is broken.
- too many people are using things without certification
- Nobody enforces required certification
- How do I get certified is the next question. We have to have an answer. Once a month classes?
- There's a lot of latent demand for certification, especially in the metal shop.
- The current problem is awareness of the options available for learning things.
- Signs used to work in the old shop, maybe we need more signs. With people's pictures on them.
- Set up machines with rfid readers to prevent uncertified users
- grace period after certification where a trainer checks their setup before they start working?
- Need a simplified manual for the tools that users can learn from on their own.
- Give them a physical copy of the manuals.
- We should get a vending machine for tooling / electronic parts
- Area hosts should provide a list of essential infrastructure by our next meeting
- Should we use the wiki or something easier? (google docs?)
- Next meeting in three weeks. (All area hosts' TODO)
- create a google group and public email forward to the area hosts. (Tim's TODO)
Edit 11/26/12: Additional important issues that were identified:
- member / project storage policies
- corporate accounts with suppliers