Anonymous

Changes

From Pumping Station One
158 bytes removed ,  06:55, 13 November 2012
Line 44: Line 44:  
===Equipment Needed===
 
===Equipment Needed===
   −
* Autosiphon?
  −
* Temperature Control System (to be built by Eric Stein, raspberry pi + gpio temperature monitoring + relay system for chiller)
  −
* Siphon hosing
   
* Electronically sample-able continuous hydrometry system (Steve has an idea, dun dun dun)
 
* Electronically sample-able continuous hydrometry system (Steve has an idea, dun dun dun)
 
* http://ipb.trainerfamily.net/pagesmith/2 beer sculpture - maybe.
 
* http://ipb.trainerfamily.net/pagesmith/2 beer sculpture - maybe.
Cookies help us deliver our services. By using our services, you agree to our use of cookies.