Difference between revisions of "Board Meeting Notes 2012-02-14"

From Pumping Station One
Jump to navigation Jump to search
m (Robot: Automated text replacement (-(\w+) MM-DD-YYYY=(\d{2})-(\d{2})-(\d{4}) +\1 YYYY-MM-DD=\4-\2-\3))
 
(8 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
{{Board Meeting Notes  
 
{{Board Meeting Notes  
| Previous MM-DD-YYYY=02-07-2012
+
| Previous YYYY-MM-DD=2012-02-07
 
| Current YY-MM-DD=02-14-2012  
 
| Current YY-MM-DD=02-14-2012  
| Next MM-DD-YYYY=02-21-2012
+
| Next YYYY-MM-DD=2012-02-21  
 
  | YYYY=2012}}
 
  | YYYY=2012}}
  
Meeting started at XX:XX pm
+
Meeting started at 07:05 pm
===Attendance===
+
=== Attendance ===
  
===Agenda===
+
* Tim Saylor
 +
* Patrick Callahan
 +
* Shawn Blaszak
 +
* Ishmael Rufus
 +
* Eric Stein
 +
* Steve Finkelman
 +
* Dan Meyers
  
====Old Business====
+
=== Agenda ===
 +
 
 +
==== Old Business ====
 
* Did Eric ever get access to our dedicated server?
 
* Did Eric ever get access to our dedicated server?
 
* Update on the space hunt
 
* Update on the space hunt
Line 16: Line 24:
 
** Status of Lawyer hunt
 
** Status of Lawyer hunt
 
* Budget for moving
 
* Budget for moving
* [[New_Member_Procedure]]: Eric made a wiki page
 
* [[Class_procedure|Teaching a class procedure]]: Tim started a wiki page.
 
* [[New_board_handover_procedure]]: Tim started a wiki page
 
* Any other procedure -> wiki page needs?
 
  
====New Business====
+
==== New Business ====
* Financial/membership report full starving members in total
+
* Financial/membership report full starving members in total
* Flourish Workshop (flourish is March 30-31)
+
* Flourish Workshop  
* The compressor for the laser is broken. Do we need anything more to fix the big one? How should we pay for new/fixing compressor?
+
* The compressor for the laser is broken. Do we need anything more to fix the big one? How should we pay for new/fixing compressor?
 +
 
 +
=== Minutes ===
  
===Minutes===
+
* Eric found out that we no-longer have a dedicated server and are being hosted on Ryan's server service.
 +
* We have received a response to the LOI for the new space.
 +
** 90 day wait for move-in (May 1st)
 +
** need to hire a lawyer to look at it
 +
*** we have a list of potential lawyers from the mailing list
 +
** ask about whether, or not, he's going to be storing the van in the garage area
 +
** make sure the following is written into the lease:
 +
*** being able to build out and move things into the new space before the lease starts.
 +
*** some provision to cover 'no answer from landlord on something that the lease requires us to request permission on, equals permission.
 +
** would he be interested in leaving his shelving?
 +
** we need to hire someone to do an inspection, the lawyer we hire may be able to make a recommendation.
 +
** Moving budget
 +
*** moving truck
 +
*** moving accessory
 +
*** table building supplies
 +
*** bribing the members to help (pizza & beer?)
 +
*** Tim will propose the vote for the moving budget and to authorize the move tonight
 +
** Do we want to start a Kickstarter for the move?
 +
* Ish has a solution for tracking memberships and will present it next meeting
 +
* The compressor for the laser cutter is, apparently, not broken and just needed more oil
 +
* Flourish workshop (flourish is March 30-31)
 +
** Ed is organizing it
 +
** Ed will be teaching Arduino
 +
** Patrick will be teaching soldering
 +
* Geoffrey purchased a gas cylinder for the welders - $212.00
 +
* Dan purchased two carts for the gas tanks and the welders - $208.00
 +
* Dan wants to buy another gas cylinder for Aluminum welding - $171.00 + gas cost
 +
* Dan needs to buy 2 solenoids for the welders
  
Meeting adjourned at XX:XX  pm
+
Meeting adjourned at 07:55 pm

Latest revision as of 18:47, 29 March 2014


Board Meeting Minutes
<< Board Meeting Notes 2012-02-07 2012 Board Meetings Board Meeting Notes 2012-02-21 >>

Meeting started at 07:05 pm

Attendance

  • Tim Saylor
  • Patrick Callahan
  • Shawn Blaszak
  • Ishmael Rufus
  • Eric Stein
  • Steve Finkelman
  • Dan Meyers

Agenda

Old Business

  • Did Eric ever get access to our dedicated server?
  • Update on the space hunt
    • Status of LOI?
    • Status of Lawyer hunt
  • Budget for moving

New Business

  • Financial/membership report full starving members in total
  • Flourish Workshop
  • The compressor for the laser is broken. Do we need anything more to fix the big one? How should we pay for new/fixing compressor?

Minutes

  • Eric found out that we no-longer have a dedicated server and are being hosted on Ryan's server service.
  • We have received a response to the LOI for the new space.
    • 90 day wait for move-in (May 1st)
    • need to hire a lawyer to look at it
      • we have a list of potential lawyers from the mailing list
    • ask about whether, or not, he's going to be storing the van in the garage area
    • make sure the following is written into the lease:
      • being able to build out and move things into the new space before the lease starts.
      • some provision to cover 'no answer from landlord on something that the lease requires us to request permission on, equals permission.
    • would he be interested in leaving his shelving?
    • we need to hire someone to do an inspection, the lawyer we hire may be able to make a recommendation.
    • Moving budget
      • moving truck
      • moving accessory
      • table building supplies
      • bribing the members to help (pizza & beer?)
      • Tim will propose the vote for the moving budget and to authorize the move tonight
    • Do we want to start a Kickstarter for the move?
  • Ish has a solution for tracking memberships and will present it next meeting
  • The compressor for the laser cutter is, apparently, not broken and just needed more oil
  • Flourish workshop (flourish is March 30-31)
    • Ed is organizing it
    • Ed will be teaching Arduino
    • Patrick will be teaching soldering
  • Geoffrey purchased a gas cylinder for the welders - $212.00
  • Dan purchased two carts for the gas tanks and the welders - $208.00
  • Dan wants to buy another gas cylinder for Aluminum welding - $171.00 + gas cost
  • Dan needs to buy 2 solenoids for the welders

Meeting adjourned at 07:55 pm