Difference between revisions of "Board Meeting Notes 2012-11-27"
Jump to navigation
Jump to search
(Adding category template so this can be more easily found.) |
|||
Line 9: | Line 9: | ||
Address the leak in the roof. This leak is by the heating unit upstairs in the closet. The last time it rained water leaked in along a coax cable going through a pipe leading out through the roof. | Address the leak in the roof. This leak is by the heating unit upstairs in the closet. The last time it rained water leaked in along a coax cable going through a pipe leading out through the roof. | ||
+ | |||
+ | The electric bill was $666.83 (our share + 121.91 carried over from before). Has this been paid? If not, pay it. |
Revision as of 18:38, 25 November 2012
Board Meeting Minutes | ||
---|---|---|
<< [[Board Meeting Notes {{{Previous YYYY-MM-DD}}}]] | 2012 Board Meetings | [[Board Meeting Notes {{{Next YYYY-MM-DD}}}]] >> |
Agenda:
Address the leak in the roof. This leak is by the heating unit upstairs in the closet. The last time it rained water leaked in along a coax cable going through a pipe leading out through the roof.
The electric bill was $666.83 (our share + 121.91 carried over from before). Has this been paid? If not, pay it.