Changes

Jump to navigation Jump to search
359 bytes removed ,  14:59, 7 October 2018
→‎Wood Shop Improvement Projects: removed completed projects
Line 98: Line 98:  
* Repair the floor on the flat sheet vertical rack (the bottom is broken) and through away the junk and edit the ticketed items. Incorporate a rack for tall sticks of lumber ( 8ft. 2x4's, long rips of narrow material).
 
* Repair the floor on the flat sheet vertical rack (the bottom is broken) and through away the junk and edit the ticketed items. Incorporate a rack for tall sticks of lumber ( 8ft. 2x4's, long rips of narrow material).
 
* Get the [[Bosch Sliding Compound Miter Saw]] station built.
 
* Get the [[Bosch Sliding Compound Miter Saw]] station built.
* Make a rack for the larger bar clamps to be affixed to the wall or even to lay flat somewhere.
  −
* New out feed table for [[SawStop table saw]] to include storage space for sleds, tenon jig, and other jigs. Paul Van Lake is building separate sleds for accurate 45 degree bevel and straight cuts, dado sled, sled for 45 degree and adjustable angle miter cuts.
   
* Jigs and fences for the [[Rockwell Delta 20" Bandsaw]].
 
* Jigs and fences for the [[Rockwell Delta 20" Bandsaw]].
 
* Plumb in some air lines. Paul Van Lake anchored the line on the wall next to the ladders so maybe we can tap off of that.
 
* Plumb in some air lines. Paul Van Lake anchored the line on the wall next to the ladders so maybe we can tap off of that.
140

edits

Cookies help us deliver our services. By using our services, you agree to our use of cookies.

Navigation menu